11/24/07

Uncategorized - No Comments » - Posted on November, 24 at 9:09 pm

Today we finally received the engine and transmission. What you’re looking at is a 5.0 HO engine and an AOD transmission. In addition to mocking up the engine mounts and transmission we put back on the doors and fenders. We should be welding in the engine soon.

engine_ (1).jpgengine_ (2).jpgengine_ (3).jpgengine_ (4).jpgengine_ (5).jpgengine_ (6).jpgengine_ (7).jpgengine_.jpg

11/22/07 Update

Uncategorized - No Comments » - Posted on November, 22 at 11:33 am

Here is a Thanks Giving Day update.  The car is entirely primered  and the ground effects kit from MustangsPlus.com has arrived.  The engine (5.0 w/ EFI and AOD transmission) should be arriving this Saturday.  You can see in the pictures that the rear seat is gone and in its place is a storage box crafted from plywood.  The rear taillights have been filled in, and soon we should have a Pony shaped taillight put in their place once we get the C&C work done.  We have also put in the new 22 gallon gas tank.  We should be doing the engine mounts soon as well and after that paint will be forthcoming.

Other projects are coming along as well as you can see in some of the other shots.

Update 9-27-2007

Uncategorized - No Comments » - Posted on November, 4 at 10:57 am

Sept 07 001 (Medium).jpgSept 07 002 (Medium).jpgSept 07 003 (Medium).jpgSept 07 004 (Medium).jpgSept 07 005 (Medium).jpgSept 07 006 (Medium).jpgSept 07 007 (Medium).jpgSept 07 008 (Medium).jpgSept 07 009 (Medium).jpgSept 07 010 (Medium).jpgSept 07 011 (Medium).jpgSept 07 012 (Medium).jpgSept 07 013 (Medium).jpgSept 07 014 (Medium).jpgSept 07 015 (Medium).jpgSept 07 016 (Medium).jpgSept 07 017 (Medium).jpgSept 07 018 (Medium).jpgSept 07 019 (Medium).jpgSept 07 020 (Medium).jpgSept 07 021 (Medium).jpgSept 07 022 (Medium).jpgSept 07 023 (Medium).jpgSept 07 024 (Medium).jpgSept 07 025 (Medium).jpgSept 07 026 (Medium).jpg

More body work

Uncategorized - No Comments » - Posted on March, 3 at 5:40 pm

Most of the body work on the car is approaching completion

IMG_0966.JPGIMG_0967.JPGIMG_0968.JPGIMG_0969.JPGIMG_0970.JPGIMG_0971.JPGIMG_0972.JPGIMG_0974.JPGIMG_0975.JPGIMG_0976.JPGIMG_0978.JPGIMG_0979.JPG

More cars and projects

Uncategorized - No Comments » - Posted on February, 8 at 5:30 pm

Here are some more pictures of other cars and projects in the class.

IMG_0950.JPGIMG_0951.JPGIMG_0952.JPGIMG_0953.JPGIMG_0954.JPGIMG_0955.JPGIMG_0956.JPGIMG_0957.JPGIMG_0958.JPGIMG_0959.JPGIMG_0960.JPGIMG_0961.JPGIMG_0962.JPGIMG_0963.JPGIMG_0964.JPGIMG_0965.JPG

Bondo and Body Work

Uncategorized - No Comments » - Posted on February, 4 at 5:29 pm
The 64 1/2 has began body work. The front vents have been welded over and the bondo has been applied and it is starting to look flush with the metal. The doors are being refined after having the handles shaved off. The rear end of the car has been taken off. We have also been taking care of the rust on the floor boards and filling in the holes.

IMG_0937.JPGIMG_0938.JPGIMG_0939.JPGIMG_0940.JPGIMG_0941.JPGIMG_0942.JPGIMG_0943.JPGIMG_0944.JPGIMG_0945.JPGIMG_0946.JPGIMG_0947.JPGIMG_0948.JPG

Students at work

Uncategorized - No Comments » - Posted on January, 25 at 5:25 pm

I just wanted to post this blog to show that there are various other cars being used in this class besides the 64 1/2 Mustang. Each student can bring in their own car and work on it, or assist another student with their project. I’ll try to get more details on others projects and goals in a later post.

IMG_0914a.JPGIMG_0915a.JPGIMG_0916a.JPGIMG_0917.JPGIMG_0918.JPGIMG_0919.JPGIMG_0920.JPGIMG_0921.JPGIMG_0922.JPGIMG_0923.JPGIMG_0924.JPGIMG_0925.JPGIMG_0926.JPGIMG_0927.JPGIMG_0928.JPGIMG_0929.JPGIMG_0930.JPGIMG_0931-1.JPGIMG_0931.JPGIMG_0932.JPGIMG_0933.JPGIMG_0934.JPGIMG_0935.JPGIMG_0936.JPG

Update

Uncategorized - No Comments » - Posted on January, 21 at 5:17 pm

Sorry for the delay, we did not have much of an opportunity to get new pictures until this weekend. The engine has finally been pulled from the car. We have selected the seats that will replace the original mustang seats and have determined where they will sit in the car. They will eventually be reupholstered further along into the project. One of the door handles has been shaved and we are currently filling it in and smoothing it out. Another project being worked on is filling in the front vents. Since we will be going to a Vintage Air system they will no longer be needed and this will eliminate one are of potential areas water can leak into.

mustang_b 001 (Medium).jpgmustang_b 005 (Medium).jpgmustang_b 006 (Medium).jpgmustang_b 008 (Medium).jpgmustang_b 009 (Medium).jpgmustang_b 011 (Medium).jpgmustang_b 012 (Medium).jpg

Back to work

Uncategorized - No Comments » - Posted on January, 12 at 5:12 pm

Not a huge update, but here are some updates. The carpeting has been removed, along with gauges and the dash pad. There is some rust on the floor boards that needs to be cleaned up and possibly patched. We are trying to figure out new seats for the car and are doing mockups of fits, we still are not close to a solution. We are removing a lot of the grime the last 40 years have left on the car. Additionally the radiator has been removed and we’ve cut room to put in a larger one in the near future. The engine may be pulled by next week.

IMG_0900 (Medium).JPGIMG_0901 (Medium).JPGIMG_0902 (Medium).JPGIMG_0903 (Medium).JPGIMG_0904 (Medium).JPGIMG_0905 (Medium).JPGIMG_0907 (Medium).JPGIMG_0909 (Medium).JPGIMG_0911 (Medium).JPGIMG_0913 (Medium).JPG

And so it begins…

Uncategorized - No Comments » - Posted on January, 12 at 5:03 pm

The class is finally underway and progress is quickly being made. The car has had its fenders, doors, hood, trunk removed, along with all of the seats taken out. The engine will also been pulled, but no pictures of that yet. Update soon…

IMG_0893__Medium___Medium_.JPGIMG_0894__Medium_.JPGIMG_0895__Medium_.JPGIMG_0896__Medium_.JPGIMG_0897__Medium_-1.JPGIMG_0897__Medium_.JPGIMG_0898__Medium_.JPGIMG_0899__Medium_.JPG